The Global Leader in Pipeline Insitu Cleaning & Coating Services

Recent Projects

View EnerClear Pipeline Rehabilitation in a larger map

Kerrobert, Saskatchewan

September/October 2010

Insitu cleaned and coated 2880m of 8" Oil line.

Ponoka, Alberta

August/September 2010

Insitu cleaned and coated 2600m of 4" CO2 line.

Ponoka, Alberta

August/September 2010

Insitu cleaned and coated 4000m of 4" CO2 line.

Ponoka, Alberta

August/September 2010

Insitu cleaned and coated 2580 of 4" CO2 line.

Ponoka, Alberta

August/September 2010

Insitu cleaned and coated 1500m of 3" CO2 line.

Ponoka, Alberta

August/September 2010

Insitu cleaned and coated 1500m of 4" CO2 line.

Lodegepole, Alberta

June 2010

Insitu cleaned and coated 280m of 4" sour gas line.

Joffre, Alberta

April/May 2010

Insitu cleaned and coated 800m of 8" H20 line within a plant setting.

Winfield, Alberta

Fall 2009

Insitu cleaned and coated 5100m of 8" oil line.

Joffree, Alberta, Canada

Fall 2008

Insitu cleaned and coated 1800m of 16" cooling water line within a plant setting.

Winfield, Alberta, Canada

Summer/Fall 2008

Insitu cleaned and coated numerous 3"-6" oil lines.

Parkersburg, West Virginia, USA

Spring 2008

Injected 8 miles of 4" fiberspar into 6" parent line.

Red Earth, Alberta, Canada

Winter 2007

Injected 25000m of 3" fiberspar into 4" parent line.

Drayton Valley, Alberta, Canada

Fall 2007

Insitu cleaned and coated 1000m of 4" water injection line. Violet Grove, near Drayton Valley, Alberta

Services

Benefits

Applications

News

  • EnerClear Website

    January 19th, 2012

    Come Visit EnerClear at Booth 2220 in Salt Lake City for Corrosion Week 2012 from March 11-15 Also, come visit us at booth 37 at the Pipeline Coatings Conference in Vienna, Austria Feb 27-29 2012

Contact Us

  • Nathan Campbell
  • No. 8 37152 CE Trail, Red Deer County
  • Alberta, Canada T4S2C2
  • Phone: (403) 396-7113
  • Fax: (403) 886-2625
  • contact@enerclear.ca