Recent Projects
View EnerClear Pipeline Rehabilitation in a larger map
Kerrobert, Saskatchewan
September/October 2010
Insitu cleaned and coated 2880m of 8" Oil line.
Ponoka, Alberta
August/September 2010
Insitu cleaned and coated 2600m of 4" CO2 line.
Ponoka, Alberta
August/September 2010
Insitu cleaned and coated 4000m of 4" CO2 line.
Ponoka, Alberta
August/September 2010
Insitu cleaned and coated 2580 of 4" CO2 line.
Ponoka, Alberta
August/September 2010
Insitu cleaned and coated 1500m of 3" CO2 line.
Ponoka, Alberta
August/September 2010
Insitu cleaned and coated 1500m of 4" CO2 line.
Lodegepole, Alberta
June 2010
Insitu cleaned and coated 280m of 4" sour gas line.
Joffre, Alberta
April/May 2010
Insitu cleaned and coated 800m of 8" H20 line within a plant setting.
Winfield, Alberta
Fall 2009
Insitu cleaned and coated 5100m of 8" oil line.
Joffree, Alberta, Canada
Fall 2008
Insitu cleaned and coated 1800m of 16" cooling water line within a plant setting.
Winfield, Alberta, Canada
Summer/Fall 2008
Insitu cleaned and coated numerous 3"-6" oil lines.
Parkersburg, West Virginia, USA
Spring 2008
Injected 8 miles of 4" fiberspar into 6" parent line.
Red Earth, Alberta, Canada
Winter 2007
Injected 25000m of 3" fiberspar into 4" parent line.
Drayton Valley, Alberta, Canada
Fall 2007
Insitu cleaned and coated 1000m of 4" water injection line. Violet Grove, near Drayton Valley, Alberta